Completed Requests by Day of Week and Cost Center Report
Purpose
The Completed Request by Day of the Week and Cost Center Report allows supervisors and managers to evaluate staffing patterns and related issues for cost centers.
Description
Only data related to transport jobs with origins and/or destinations within the membership of the user who generated the report appears.
Only transport jobs whose status is Completed appear on the report. Only transport jobs with origin and destination locations in cost centers that were selected in the report criteria are included. If cost centers were not individually selected, then all cost centers associated with locations in the selected campus are included. The originating cost center for the job is displayed on the report. The report displays only cost centers that meet the report criteria and that contain transport job origin and destination locations that are within the membership of the user who generated the report.
Note: Dates and times appear in the format configured in the Admin Tool component or in Admin > Settings > Capacity Management. For example, dates might appear in dd/mm/yyyy format (07/05/2016 is May 7, 2016) and times might appear in twenty-four-hour format (16:00 is 4 PM).
The criteria selected when the report was generated (such as date time range) appear on the report.
Name | Description (for each day of the week) |
Cost Center | Each cost center included in the report that includes an origin location for a transport job that meets the report criteria. |
Number of Trips | The number of completed transport jobs that had origins in each cost center for that day. |
Day of Week Totals | Total number of completed transport jobs that had origin locations in all cost centers listed for that day. |